Instructions For Use of Almond Three Stage Sheller Machine

Posted by cara
Instructions for use of three stage almond shelling machine:
1, the machine before use, first of all according to the size of the apricot kernel to adjust the gap of processing roller at all levels, according to the size of the apricot flat size, roughly divided into three levels, according to apricot flat size from large to small, In turn, the gap size of the first, second and third processing rolls is adjusted, and the gap of the press roll should be 1-1.5mm smaller than the apricot bias size.
2, the gap can be adjusted after the power on, the order of the boot: the total vibrating screen → three processing → secondary processing → a processing → hoisting machine → feeding.
3, in a large number of processing, the first investment in a small amount of apricot, check the gap between the pressure roller is appropriate, if the processing of almond broken more serious, please adjust the gap until the desired effect.
4, after the end of processing, in accordance with the following order in order to stop, hoist -a processing-secondary processing-three processing-total vibrating screen.
 
Matters Need Attention:
1, the hoist in the course of work, prone to deviation phenomenon, affecting the performance, please adjust the adjustment bolts at both ends, to return to normal state.
2, the transmission parts, sprockets, bearings regularly add lubricating oil, the bolt regularly check, fast to ensure the normal use.